So the outside of the house looks the same as last week but the interior has changed dramatically. All of the wiring and the plumbing has been completed and the dry-wall is going up. We had an inspection on it at the end of this last week and everything past. The builder we are going through does the exterior insulation but if you want any of the interior walls insulated then you have to do it yourself. Since we were out in California over the weekend that didn't leave us a lot of time. The plan was for the dry wall to be finished on Tuesday. So Monday after work Cameron went to the house with a couple guys from the ward and put in some extra insulation on some of the interior walls. Mainly the walls that touch both a bedroom and bathroom to reduce noise and the wall that goes along the master bedroom and stairwell. From top to bottom you are looking at the living room, kitchen, stairwell, and master bedroom. Its all coming along great.